New Commercial Construction

Have questions about working with Rubicon? We’ve got answers. Browse our most frequently asked questions to learn more about our services, sectors, and what to expect when working with our crew.

Yes. Mixed-use industrial facilities that combine warehouse or service space with office and customer-facing areas are a project type Rubicon has experience with. The Pape Kenworth project included integrated retail and office spaces within a larger warehouse and service building. Managing the construction standards for both the industrial and the commercial portions of that type of facility requires experience with both, and Rubicon has built that type of project.

Yes. Rubicon participates in the design phase to provide constructability review, identify coordination issues between design disciplines, and flag items that will affect budget or schedule before they become problems during construction. This is most valuable during the design development and construction document phases, when changes are still inexpensive relative to what they would cost in the field.

Yes. Rubicon manages phased interior work in occupied commercial spaces where the business needs to continue operating during construction. This requires structuring the scope in stages, scheduling disruptive work outside business hours, and coordinating temporary access and workspace arrangements with the tenant's team.

Yes. Rubicon supports multi-site restaurant buildout programs where the operator is opening multiple locations with consistent kitchen layouts and equipment packages. Consistent kitchen construction across locations reduces training time and allows the operator's team to move between sites without relearning the space. Call (509) 381-4198 to discuss the scope and geography of a multi-site restaurant program.

Yes. Rubicon builds commercial kitchens for restaurants, quick-service operators, bakeries, and food service facilities. The team has completed commercial kitchen construction for multiple restaurant clients including Panda Express, Evergreens, Hot Cakes, Piroshki's, and others. Commercial kitchen projects include hood and exhaust systems, grease interceptors, commercial plumbing, high-capacity electrical, and coordination with the operator's kitchen equipment package.

Yes. Rubicon supports ground-up commercial construction from site work and foundations through building systems and interior finish. A confirmed example is the Pape Kenworth project, a large-scale ground-up warehouse and service building with integrated retail and office spaces. Rubicon works with clients across the Pacific Northwest and its Arizona, Texas, and Tennessee expansion markets on ground-up commercial projects of varying size and complexity.

Yes. Rubicon supports warehouse construction, industrial tenant improvements, and commercial service building construction. Confirmed projects include the Pape Kenworth ground-up warehouse and service building and the Pape Material Handling workspace remodel, which included industrial lift installation. Rubicon works with industrial clients across the Puget Sound Region, Oregon, and Idaho.

Yes. Rubicon coordinates with industrial equipment vendors during preconstruction to make sure the facility is designed and built to accommodate the equipment's structural, utility, and access requirements. The Pape Material Handling project included coordination and installation of an industrial vertical lift system. Equipment coordination during preconstruction prevents costly field modifications after the structure is in place.

Yes. Rubicon reviews the kitchen equipment specifications and coordinates rough-in locations, utility connection requirements, and equipment clearance dimensions with the construction documents before work begins. Catching mismatches between the equipment package and the construction documents in preconstruction is significantly less expensive than resolving them after rough-in is complete.

Yes. Rubicon works in both new commercial construction and tenant improvement projects. New construction is a more involved process with more partners, a longer timeline, and different risk structure than a tenant improvement, but Rubicon applies the same practical approach to both: early budget transparency, direct communication, and construction management that keeps the project on schedule and within the scope the owner agreed to.

Yes. Rubicon handles permit applications and coordinates the review process for commercial construction projects, including tenant improvements, new construction, and specialty use buildouts. This includes the building permit as well as trade permits for mechanical, plumbing, and electrical work when those are required by the jurisdiction. Rubicon manages the coordination between the design team and the building department to keep the review process moving.

Rubicon works alongside the design team, not in place of it. Most commercial projects require licensed architect and engineering documents for permitting. Rubicon's role in design-build coordination is to review those documents, identify constructability issues and coordination gaps, and work with the design team to resolve them before construction begins. Rubicon does not provide architectural or engineering services.

Yes. Rubicon works with the tenant's architect, interior designer, or space planner as part of the construction team. The team coordinates submittal reviews, finish selections, product lead times, and installation sequences to make sure the design intent is executed correctly within the construction schedule.

Rubicon provides early budget input based on the building program and site before design is complete, which gives the owner realistic cost expectations and helps shape design decisions. As design progresses, Rubicon updates the budget at each milestone so the owner can make informed decisions before commitments are made. This prevents the most common problem in new commercial construction, which is a design that significantly exceeds the budget by the time it's ready to price.

As early as possible. Ground-up construction budgets are heavily influenced by decisions made during the design phase, including structural system selection, building envelope specifications, and site improvement scope. Rubicon can provide early budget input and constructability review during schematic or design development to help the client understand how design choices affect cost before those choices are finalized. Earlier involvement reduces the cost of design changes and improves the accuracy of the project budget.

New commercial construction timelines vary significantly by project size, site conditions, jurisdiction permitting timelines, and design complexity. From the start of design to certificate of occupancy, a mid-sized commercial building typically takes 18 to 36 months, with design and permitting accounting for roughly half of that. Rubicon will provide a project-specific schedule based on the program and site.

Commercial permit timelines in the Puget Sound Region vary by jurisdiction and project type. Simple tenant improvement permits in some jurisdictions can be approved in two to four weeks. More complex projects, specialty use types, or projects in jurisdictions with higher permit volumes may take eight to twelve weeks or longer. Rubicon accounts for jurisdiction-specific review timelines when building the project schedule so clients have a realistic picture of the approval process before work begins.

Design-build coordination means the general contractor is actively reviewing and aligning documents from architects, engineers, and equipment vendors before and during construction, rather than simply building from whatever documents arrive. The goal is to identify conflicts and gaps in the design documents early, when they are still inexpensive to resolve, rather than discovering them as field problems during construction. Rubicon provides this coordination as part of the preconstruction and construction process.

A tenant improvement starts with an existing building shell and involves constructing the interior space to suit the tenant's needs. Ground-up construction starts with a site and involves constructing the entire building, including site work, foundation, structural framing, building envelope, all building systems, and interior finishes. Ground-up projects are broader in scope, take longer to complete, and require a contractor with the capacity to manage the full range of trades and coordination from the start of the project.

Commercial kitchens involve a combination of systems that do not appear in other commercial spaces at the same density or load requirements. Type I hood and exhaust systems require penetrations through the roof with fire-rated assemblies. Grease interceptors require specific plumbing configurations. Commercial cooking equipment requires gas and electrical service at capacities that affect the building's utility infrastructure. Health department requirements add another layer of finish material and layout standards beyond the building code.

Rubicon serves industrial clients throughout the Puget Sound Region, Oregon, and Idaho. That includes established industrial markets like Seattle, Tacoma, and the Port of Seattle area, as well as suburban industrial markets in the greater Puget Sound area, the Portland metro area in Oregon, and the Boise area in Idaho. Call (509) 381-4198 to discuss a specific project location and scope.

Rubicon is positioned for regional commercial projects, not large-scale national construction programs. Ground-up projects in the range of small commercial buildings, service facilities, and specialty commercial construction are a good fit. Call (509) 381-4198 to discuss the specific scope, size, and timeline of a ground-up project and whether Rubicon is the right fit.

The earlier Rubicon is involved in the design process, the more value the coordination work provides. Ideally, Rubicon reviews the project scope during schematic design so that budget and constructability input can shape the design before it is fully developed. Rubicon can also be brought in later, during design development or construction documents, to review and coordinate before permit submission. Earlier involvement reduces the cost of design changes and improves the accuracy of the project budget.

Specialty commercial spaces like dental offices, veterinary clinics, commercial kitchens, and medical offices have equipment specifications that drive a large portion of the construction documents. The rough-in locations, utility capacities, ceiling heights, and structural requirements for that equipment need to be coordinated with the architectural and engineering documents before work begins. Gaps in that coordination are one of the most common sources of change orders and schedule delays on specialty commercial projects.

Have more questions?

Call the Rubicon team to discuss your project, or submit an inquiry.