Yes. Rubicon can provide rough order-of-magnitude budgets based on the project type, space size, and program requirements, even without complete design documents. These early estimates carry a wider range than a detailed construction estimate but are still more accurate than typical cost-per-square-foot benchmarks, which don't account for the specific conditions and requirements of the project at hand.
The structure varies. For clients who move forward with Rubicon for construction, preconstruction services are often included in the overall project relationship. For clients who need preconstruction input before they've committed to a construction contract, Rubicon can discuss a preconstruction services agreement covering the specific scope of pre-design or pre-permit input needed.
Yes. Rubicon handles permit applications and coordinates the review process for commercial construction projects, including tenant improvements, new construction, and specialty use buildouts. This includes the building permit as well as trade permits for mechanical, plumbing, and electrical work when those are required by the jurisdiction. Rubicon manages the coordination between the design team and the building department to keep the review process moving.
Rubicon works alongside the design team, not in place of it. Most commercial projects require licensed architect and engineering documents for permitting. Rubicon's role in design-build coordination is to review those documents, identify constructability issues and coordination gaps, and work with the design team to resolve them before construction begins. Rubicon does not provide architectural or engineering services.
As early as possible. Ground-up construction budgets are heavily influenced by decisions made during the design phase, including structural system selection, building envelope specifications, and site improvement scope. Rubicon can provide early budget input and constructability review during schematic or design development to help the client understand how design choices affect cost before those choices are finalized. Earlier involvement reduces the cost of design changes and improves the accuracy of the project budget.
Commercial permit timelines in the Puget Sound Region vary by jurisdiction and project type. Simple tenant improvement permits in some jurisdictions can be approved in two to four weeks. More complex projects, specialty use types, or projects in jurisdictions with higher permit volumes may take eight to twelve weeks or longer. Rubicon accounts for jurisdiction-specific review timelines when building the project schedule so clients have a realistic picture of the approval process before work begins.
Long-lead items are materials or equipment that require extended order and delivery timelines, often eight to twenty weeks or more. Common examples on commercial projects include dental and veterinary equipment packages, commercial kitchen equipment, specialty HVAC systems, custom millwork, and certain structural materials. If long-lead items are not ordered early enough in the project timeline, they can delay construction completion even when all other work is on schedule. Rubicon identifies long-lead items during preconstruction and builds procurement milestones into the project schedule to prevent that situation.
Design-build coordination means the general contractor is actively reviewing and aligning documents from architects, engineers, and equipment vendors before and during construction, rather than simply building from whatever documents arrive. The goal is to identify conflicts and gaps in the design documents early, when they are still inexpensive to resolve, rather than discovering them as field problems during construction. Rubicon provides this coordination as part of the preconstruction and construction process.
Preconstruction includes CSI-based budget development, critical path method (CPM) schedule planning, constructability review, subcontractor bid solicitation, and coordination input provided before construction begins. For tenant improvement projects, it typically starts with a space evaluation and rough budget before lease signing, then continues through design development as the scope becomes more defined. For new construction, it starts earlier and involves more design-phase interaction as the architect develops the project.
Before signing the lease for a tenant improvement project, or before finalizing the design program for a new construction project. The earlier the contractor is involved, the more influence preconstruction input can have on the decisions that drive cost. By the time a construction document set is complete, the major cost decisions have already been made and what remains is to price them accurately.
The earlier Rubicon is involved in the design process, the more value the coordination work provides. Ideally, Rubicon reviews the project scope during schematic design so that budget and constructability input can shape the design before it is fully developed. Rubicon can also be brought in later, during design development or construction documents, to review and coordinate before permit submission. Earlier involvement reduces the cost of design changes and improves the accuracy of the project budget.
Specialty commercial spaces like dental offices, veterinary clinics, commercial kitchens, and medical offices have equipment specifications that drive a large portion of the construction documents. The rough-in locations, utility capacities, ceiling heights, and structural requirements for that equipment need to be coordinated with the architectural and engineering documents before work begins. Gaps in that coordination are one of the most common sources of change orders and schedule delays on specialty commercial projects.
Have more questions?
Call the Rubicon team to discuss your project, or submit an inquiry.
Start A Project Conversation
Looking for a contractor with experience in your type of space? Call Rubicon at (509) 381-4198 or start a project inquiry.